Schoolhouse Rocks Inc. ← Back to schoolhouserocks.ca

Port LaTour · Barrington, Nova Scotia

From schoolhouse to homes.

The Port LaTour Consolidated Elementary School was built in 1956, closed in 2000, and sat empty for more than twenty years. Schoolhouse Rocks bought it in the spring of 2023 and turned it into 15 affordable homes — keeping the building’s bones, and its place in the community. This is that build, in the order it happened.

The finished Port LaTour building, November 2024: grey siding, black shutters, red doors, stone veneer foundation, and a Canadian flag flying out front
November 2024 — home. Fifteen affordable homes, housing people again.
15Homes, one- & two-bedroom
4Wheelchair-accessible units
8,000+Square feet converted
1956School built
2000School closed
2024Conversion completed

Before — a school, empty.

The Port LaTour Consolidated Elementary School served the community for generations — classrooms, big windows, and a building made to last. It closed in 2000 and sat empty for more than twenty years, while people looked for a place to live.

Archival black-and-white photograph titled Port La Tour Elementary School, Shelburne County, N.S., with children standing on the front steps
The school in its school days. Port La Tour Elementary School, Shelburne County, N.S., with children on the front steps — the building as generations of local kids knew it.

The build — 2023 to 2024.

Schoolhouse Rocks purchased the old school in the spring of 2023, with a plan to turn it into affordable housing rather than let it sit empty. M Nickerson General Contracting led the conversion: framing fifteen new homes inside the old school shell, with new kitchens and bathrooms throughout.

June 2023

Stripped back to the bones

Inside, the building is stripped back to its bones — the old classrooms gutted to the studs, the school’s original checkerboard floor still down.

Interior of the Port LaTour school stripped back to the studs, with the original checkerboard floor and construction debris
June 2023 — the interior stripped to the studs.

June 2023

New walls going up

The new homes take shape inside the old shell — stud walls rising where classrooms used to be.

New stud-wall framing going up inside the Port LaTour school, with the checkerboard ceiling above
June 2023 — framing the new homes inside the school.

September 2023

Opening it up

Demolition work inside — a block wall comes down as the floor plan is opened up for the new homes.

Demolition inside the Port LaTour school: a collapsed block wall and rubble on the floor
September 2023 — a block wall comes down.

December 2023

Drywall — rooms taking shape

The first rooms appear: drywall up, taped and mudded, with the finish work starting.

Interior of a Port LaTour unit with drywall up and taped, a worker on stilts finishing the walls
December 2023 — drywall up, the first rooms taking shape.

January 2024

Framing and the new envelope

The rebuild in full swing: new stud walls going up inside — the original checkerboard floor still down — while outside the building gets its new roof, Tyvek wrap, windows and doors.

New stud-wall framing inside the Port LaTour school in January 2024, with the original checkerboard floor still in place and a red ladder
New stud walls, checkerboard floor still down.
Interior framing and plumbing trenches cut into the concrete slab at Port LaTour
Plumbing trenches cut into the slab.
Framing inside the Port LaTour conversion, with a door waiting to be hung
Framing, January 2024.
Exterior of the Port LaTour building in Tyvek wrap with a new roof, January 2024
The new envelope: Tyvek, new roof.
Front of the Port LaTour building in Tyvek wrap with new windows and doors and a deck frame, January 2024
Windows and doors in, deck frame going up.

March 2024

Siding and stone

The outside takes its finished look: grey siding up top, dark stone below, scaffolding still up.

Exterior of the Port LaTour building with grey siding and dark stone veneer going on, scaffolding up, March 2024
March 2024 — siding and stone going on.

April 2024

Nearly there

Doors and windows in, the grey siding and stone finished — the building looks like homes now.

Finished exterior of the Port LaTour building with grey siding, dark stone base, and doors and windows in, April 2024
April 2024 — the finished exterior.
Rear of the Port LaTour building with grey siding and the deck frame, April 2024
The rear, decks still to come.

May 2024

Insulation, drywall and decks

The last of the inside work — insulation and drywall — while outside the decks and stairs go up.

Pink insulation in the wall framing of a Port LaTour unit, with drywall going up, May 2024
Insulation and drywall inside.
Side exterior of the finished Port LaTour building, May 2024
The finished side, May 2024.
Rear deck stairs being built at Port LaTour, with lumber and a mitre saw, May 2024
Deck stairs going in.

After — housing people again.

Completed in 2024, the former school is now 15 affordable one- and two-bedroom homes — four of them wheelchair-accessible, a washer and dryer in every unit, and small decks on the back-wall units. The homes are managed by Carla Lee Property Management, and a community garden is planned for the grounds.

The finished Port LaTour building with decks and stairs, gravel lot, August 2024
August 2024. Decks and stairs in, the building complete.
The finished Port LaTour building from the side, with deck and stairs, August 2024
August 2024. The finished building, ready for residents.

Every project starts with an unusual building.

Port LaTour was a school. The next one could be a church, a hall, or a building in your community with no future — Schoolhouse Rocks turns it into homes.

See all our projects at schoolhouserocks.ca